Windows and siding in St. Louis County

21 places we cover, and the rules that apply in each.

Missouri has no statewide building code and no statewide energy code. Adoption happens municipality by municipality, which is why the table below does not read like one county at all — it reads like 21 separate countries. Between them these places have adopted 10 different energy code arrangements.

69.2% of the housing in St. Louis County was built before 1980, and 9.6% before 1940 (42,898 of 445,472 units). That is the number that decides whether the federal lead rule is on your job, and on both of these trades it very often is: window replacement is never exempt from it at any size, and a whole-house re-side clears the exterior threshold immediately.

PlacePermit to re-side?Permit for a like-for-like window?Adopted energy codeWindow must meet
AfftonDependsDepends2015 IRC energy provisions (no separate IECC adopted)U-0.34
BallwinYesYesNone — the energy chapter is deletedNone adopted
BrentwoodYesNot published2024 IECCU-0.28
ChesterfieldDependsDepends2015 IRC energy provisions (no separate IECC adopted)U-0.34
ClaytonYesYes2021 IECCU-0.30
Creve CoeurNot publishedNo2015 IECC (Seventh Edition)U-0.35
Des PeresYesYes2018 IRC energy provisions (no separate IECC adopted)U-0.32
EllisvilleNot publishedNot publishedNot published
EurekaDependsDependsNot publishedNone adopted
FlorissantDependsYes2021 IECCU-0.30
KirkwoodNot publishedNot published2021 Energy Conservation CodeU-0.30
ManchesterDependsDepends2015 IRC energy provisions (no separate IECC adopted)U-0.34
Maryland HeightsNot publishedYes2015 IECC (as amended)U-0.35
MehlvilleDependsDepends2015 IRC energy provisions (no separate IECC adopted)U-0.34
OakvilleDependsDepends2015 IRC energy provisions (no separate IECC adopted)U-0.34
Richmond HeightsNot publishedNot published2024 IECCU-0.28
Town and CountryDependsNoNot publishedNone adopted
Unincorporated St. Louis CountyDependsDepends2015 IRC energy provisions (no separate IECC adopted)U-0.34
University CityDependsYes2018 IECCU-0.32
Webster GrovesYesYes2015 IECCU-0.35
WildwoodDependsDepends2015 IRC energy provisions (no separate IECC adopted)U-0.34

Things worth knowing before you sign anything

Affton

Affton is unincorporated, so St. Louis County is its building department and there is no city hall to call. Affton is an unincorporated census-designated place, not a municipality. It has no city government, no building department and no municipal code; permits for single-family work are issued by the St. Louis County Department of Transportation and Public Works, Residential Building section. That establishes the county ordinance number and date but not the I-Code editions behind it, not the permit-exemption list, and not any energy code.

Ballwin

Ballwin runs its own building department — it is one of the few cities in this part of the county that does not contract the work to St. Louis County. Dual licensing: Ballwin is the clearest case in this metro of a city that requires a contractor to hold both a city license and an active St. Louis County license in the relevant trade before pulling a permit - so a siding or window crew licensed only at the county level, or only in another municipality, cannot work. Second quirk: the published code edition is in flux (2015 standards in force, 2024 I-Codes proposed for 2026), and the proposed package conspicuously omits an energy code.

Brentwood

Brentwood also runs the newest code stack in this dataset — 2024 IRC (with a long appendix list), 2024 IBC and 2024 IECC.

Chesterfield

Chesterfield contracts with St. Louis County for building, residential and existing-building code enforcement, so the County’s exempt-work list and its U-0.34 window condition are what apply here. The city keeps property maintenance and land disturbance for itself. Chesterfield does not run a fully self-contained building department: City Code Section 500.020 provides that 'The City of Chesterfield, Missouri, is hereby authorized and directed to execute and enter into a contract on behalf of the City with St. Louis County, Missouri, for technical code enforcement services, which contract shall be on file in the City offices.' An editor's note confirms the current contract is on file rather than published, so the split between what the City handles and what County staff handle is not publicly documented. The city also runs a separate Architectural Review Process and a 'Planner of the Day' desk.

Clayton

Clayton is the strictest of the places we cover on the exterior envelope: no siding exemption, no window or glazing exemption, and a mandatory design-review layer on top. 'Exterior alterations require approval from the Architectural Review Board or receive administrative architectural review,' with published fees of $135 for ARB review and $85 for the administrative track - so a re-side or a window replacement carries a design-review cost and a meeting calendar, not just a permit. Doubling of permit fees for starting work before the permit issues (100% additional) is also expressly codified. Plumbing work uniquely requires a Master Plumber licensed by both St. Louis County and the City of Clayton.

Creve Coeur

Creve Coeur also adopts St. Louis County Mechanical, Plumbing and Electrical Codes rather than the I-Codes for those trades. Permitting runs through an outside portal at crevecoeur.onlama.com.

Des Peres

Des Peres contracts with St. Louis County for mechanical, electrical and plumbing inspection but keeps the building and residential codes in-house, so the County’s siding and window exemptions do not reach here. No architectural review board or design review body was found in any published Des Peres source, despite the city's affluence — unlike Town and Country and Brentwood, which both have one. Permit questions are routed to Public Works (Permits@DesPeresMO.org), not to a standalone building department.

Ellisville

Ellisville adopts the 2015 National Green Building Standard alongside the I-Codes — an unusual adoption for a St. Louis County municipality and the only green-building standard found in this metro. Permit review sits with the Engineering Department rather than a standalone building department. The building permit fee basis ($3.00 per $1,000, $15.00 minimum) is by a wide margin the cheapest in this metro.